This is a case study of the replacement work of an aging iron overflow weir with a new resin one.
We would like to introduce a case of replacing an aging iron overflow weir in a certain housing complex with a new resin one.
The existing overflow weir at the site was at risk of falling due to aging, necessitating prompt restoration.
After a site survey, we manufactured an overflow weir of the same size using PVC and carried out replacement work including surrounding equipment.
【Construction Case】
■ Manufacturing Days: 14 days
■ Type of Work: Equipment Installation
■ Working Days: 2 days
■ Date/Location: June 2019/Shiga Prefecture
■ Equipment Used: Trench, Center Well
*For more details, please refer to the PDF materials or feel free to contact us.